Investor information

AN EVIDENCED COMMERCIAL PROBLEM. A DEFINED ROUTE TO ENGINEERING PROOF.

EcoStamp is a patent-pending waste-compaction concept focused initially on commercial 1100L bins. Operator and waste-sector evidence informs the problem and engineering requirements. The product remains at pre-feasibility: technical performance, regulatory suitability, manufactured cost, comparative advantage and customer economics all require validation.

EcoStamp is currently at the pre-feasibility and early commercial-validation stage. Engineering feasibility has not yet started. Product feasibility, performance, market assumptions and commercial outcomes remain unverified and require independent assessment and measured validation.

Portable EcoStamp commercial bin compactor concept
Current development route Portable commercial compaction concept
Current stage Pre-feasibility and operator discovery
01 Existing infrastructure

The concept is being developed around standard commercial 1100-litre bins rather than requiring an entirely new waste-container system.

02 Multiple product routes

Portable and fixed-position concepts are being explored for different operating environments and customer requirements.

03 Cross-sector exploration

Operator discovery is exploring whether similar waste-management pressures arise across hospitality, leisure, events, retail and multi-site commercial environments.

04 Validation-led development

The next stages are focused on independent engineering feasibility, prototype development and measured commercial pilots.

The commercial problem

Waste collection can be a recurring operating cost.

Commercial organisations may incur repeated waste-collection costs across bins, sites and collection cycles. Where bins fill quickly, collection frequency and operational pressure may increase.

EcoStamp is being developed around a straightforward commercial question: can more effective use of existing bin capacity help reduce collection pressure without replacing the underlying waste infrastructure?

Any suitability for individual locations, regional operators or national multi-site estates would need to be established through engineering feasibility, operator assessment and measured pilot evidence.

01

Recurring expenditure

Waste collection is an ongoing operating expense rather than a one-time capital cost.

02

Visible operational pressure

Overflowing bins, repeated vehicle movements and waste-area presentation create visible commercial consequences.

03

Established container format

The concept is being designed around the 1100-litre commercial-bin format used by many of the operators currently being considered.

04

Potential multi-site application

If independently validated, a future solution could be assessed for sites where similar waste-management pressures recur.

Why now

Operators are examining cost, efficiency and environmental impact.

EcoStamp is undertaking early commercial validation with operators that are examining collection costs, vehicle movements, waste-area efficiency and sustainability reporting.

Cost pressure

Recurring collection expenditure

Frequent uplifts may create a repeating cost across busy or multi-site operations.

Operational pressure

Busy commercial environments

Overflow, staff handling and constrained waste areas can affect normal site operations.

Environmental pressure

Vehicle movements and reporting

Some organisations are seeking better information about vehicle movements and waste-related environmental impacts.

Infrastructure fit

Designed around existing bins

The concept is being explored around the commercial containers operators already use.

Product strategy

Two concepts addressing one commercial problem.

EcoStamp is exploring two engineering approaches rather than relying on a single installation format. Final product direction will depend on independent feasibility work and operator requirements.

Portable EcoStamp concept
Portable route

Portable EcoStamp

A portable concept being explored for flexible, temporary, seasonal or shared deployment across suitable commercial bins.

  • Designed around existing 1100L bins
  • Potential movement between suitable bins
  • No permanent ground installation proposed
  • Possible seasonal and peak-period use
Fixed-position EcoStamp concept
Fixed-position route

Fixed EcoStamp

A fixed-position concept being explored for commercial waste compounds requiring permanent installation and regular use.

  • Permanent waste-area positioning
  • Potential wall-mounted configuration
  • Designed for repeated operator use
  • Commercial compound integration
Initial operator-discovery sectors

Exploring environments where waste volume may create operational pressure.

Early operator discovery is focused on sectors where occupancy, footfall, seasonal demand or multi-site operations can create frequent commercial-bin collections.

Hospitality

Hotels and food service

Sites managing regular food, packaging and guest-generated waste.

Leisure

Holiday and visitor parks

Seasonal environments experiencing concentrated occupancy and fluctuating collection demand.

Events

Festivals and venues

Temporary or high-footfall environments where waste volume can rise sharply over short periods.

Commercial estates

Retail and industrial sites

Multi-tenant and multi-site operations using standard commercial waste infrastructure.

Commercial models under consideration

PREFERRED COMMERCIAL ROUTE — LICENSING-LED

DH Eco Solutions intends to develop and protect the underlying intellectual property, commission independent engineering and build measured commercial evidence, then negotiate licensing or related arrangements with suitable industrial partners.

Subject to proof and agreement, partners could provide manufacturing, distribution, sales, installation and service infrastructure. Direct sale, leasing or service offers may be future routes used by commercial partners; they are not established EcoStamp revenue streams. No licence, partner, royalty or investment agreement is in place.

01

Licensing-led approach

The intended strategy is for DH Eco Solutions to retain ownership or control of its core intellectual property, with future licensing rights and commercial arrangements subject to negotiation.

02

Industrial partner infrastructure

Subject to proof and agreement, partners could provide manufacturing, distribution, sales, installation and service infrastructure.

03

Potential partner sales routes

Direct sale, leasing or service offers may be future routes used by commercial partners; they are not established EcoStamp revenue streams.

04

Current agreement position

No licence, partner, royalty or investment agreement is in place.

Development pathway

STAGE-GATED ENGINEERING — FILAMENT PD REVISION 4

01 6–8 weeks

PHASE 1 — DISCOVER

Commercial 1100L test rig, force/crushing analysis, selected bin/waste testing, wall-mounted feasibility and an initial manufacturing-cost review.

02 12–14 weeks

PHASE 2 — DESIGN

Functional alpha prototype, design/verification, supplier quotation pack and initial compliance planning.

03 10–14 weeks

PHASE 3 — DELIVER

Beta field-trial units and a pilot-ready design pack, subject to prior evidence.

04 4–6 months

PHASE 4 — DEPLOY

Production-ready documentation, quality plans, manufacturer handover and technical files for independent compliance assessment.

Phase 1 may be commissioned independently. Later stages require evidence review, funding and separate agreement. All timings are indicative.

Investment focus

THE FIRST FUNDING DECISION IS FEASIBILITY

The immediate objective is to fund an independently commissionable Phase 1 programme that tests the commercial 1100L engineering fundamentals and provides a reasoned go, modify, hold or stop decision. Phase 1 can be ordered without any obligation to proceed to Phase 2.

Further engineering, independent testing, pilot operation, manufacturing setup and business costs require separate scope and funding decisions. Engineering proposal amounts and investment terms are available through controlled investor discussion rather than a public funding promise.

Early concept development

See the concept principle in action.

Demonstration footage provides an early illustration of the EcoStamp concept and its intended relationship with a standard commercial bin.

Footage may show historic or early-stage prototype material and should not be interpreted as independently validated commercial performance.

Responsible development

Environmental ambition supported by formal reporting.

DH Eco Solutions Ltd has established emissions benchmarks, Carbon Reduction Plans and a long-term Net Zero commitment.

2050 Net Zero commitment
50% Reduction target by 2030
24.2 Baseline tCO₂e benchmark
Investor and strategic partner discussions

Discuss the next development stage of EcoStamp.

EcoStamp welcomes preliminary discussions with prospective investors, engineering partners, manufacturers and commercial operators able to support independent feasibility, prototype development and future measured pilots.

This page is for general information only and is not an offer, invitation or recommendation to invest. Any future investment proposal would be subject to formal documentation and appropriate legal, financial, commercial and technical due diligence.